How to Manage Assignments in Planner

Plan a member on a project by dragging across their days, set the assignment up, then move, resize, split, duplicate or delete it on the timeline.

You're all set

That's the whole walkthrough. Replay it, or carry on with the next guide.

Step 1 of 16

Step 1 of 16

Select days on the timeline

An assignment plans one member on one project for a run of days. In Planner, drag across the free days on the member's row.

Create Assignment opens with the Member and the Start and End Dates already filled in.

Step 2 of 16

Choose the project

Open Project and pick the project you are planning. The search box at the top of the list helps when it is long.

If the project is Tentative, the status switches to Unconfirmed for you.

Step 3 of 16

Check the hours and dates

Hours per day starts at 08:00 whatever the member's working day, so change it for part-time work. Total shows the hours over the whole period, less the member's approved time off.

Change Start and End Dates here if the days you dragged across were not quite right.

Step 4 of 16

Choose a status

  • Confirmed: agreed work. Time Tracking counts only confirmed assignments as booked hours.
  • Unconfirmed: planned, still waiting for a yes.
  • Draft: an early idea, before the project or the member is settled.

Unconfirmed and Draft add Probability, how likely the work is to happen.

Step 5 of 16

Check the rate and billing

Hourly Rate Source follows the project's billing and shows the Rate per Hour and Currency it gives this member. Pick another source, or Custom Rate, to bill this assignment differently (how project rates work).

Untick Is billable for work you do not bill, and the rate goes to zero.

Step 6 of 16

Set weekends and background work

Skip weekends is ticked by default, so Saturdays and Sundays get no hours.

Tick Is background work for work that runs alongside the main job, such as internal tasks. It is left out of utilization, but still appears when you generate invoices and bills.

Step 7 of 16

Add a note

Click Notes and add anything the team should know about this assignment. The note shows on the assignment's card in the planner.

Step 8 of 16

Create the assignment

Click Create Assignment. Opsium checks it against the member's other assignments, saves it, and it appears on their row.

The percentages above the row show how much of each day is now planned.

Step 9 of 16

Open and edit an assignment

Rest the pointer on an assignment to see its card, with its status, billing, rate, dates, hours and note. Click the assignment to open Edit Assignment.

Change what you need and click Edit Assignment to save. The member cannot change, and once an assignment is saved as Confirmed its status is locked.

Step 10 of 16

Drag it to other days

Drag an assignment along the member's row to move it. It keeps its length and its hours per day, and the day percentages update.

Step 11 of 16

Drag an edge to resize it

Drag the start or the end of an assignment to make it longer or shorter. Only the end you drag moves.

Step 12 of 16

Split an assignment

Rest the pointer on the assignment and click the scissors on its card. A cut line follows the pointer; click where the assignment should split.

You get two assignments with the same settings, so hours, status or rate can change from that day on. A one-day assignment cannot be split.

Step 13 of 16

Duplicate an assignment

Click the copy icon on the assignment's card, move the pointer to the day the copy should start, and click.

The copy keeps every setting and stays on the same member's row, ready for the next block of the same work.

Step 14 of 16

Delete an assignment

Click the bin on the assignment's card, then Delete in Delete assignment. A deleted assignment cannot be brought back.

Step 15 of 16

Respect member availability

A member who has not joined yet shows Member not joined and the day they start; an archived member shows the day they left. Days outside their time on the team are greyed.

Planner will not create or move an assignment onto those days, and shows Member unavailable instead.

Step 16 of 16

Avoid overlapping assignments

A member cannot have two assignments on the same project on the same day. Creating, moving, resizing or duplicating into one shows Assignment overlap, and nothing changes.

Back-to-back assignments on one project are fine, and assignments on different projects may overlap.