Last updated · October 28, 2026
Planner Utilization, Grouping, and Preferences
Read each member's utilization, see how a capacity change moves it, and choose what Planner counts — billable capacity, statuses, project groups and placeholders.
Step 1 of 11
Read a member's utilization
Open Planner. Above each member's assignments, every working day shows their utilization, the share of their capacity that assignments book.
Point at a day to see the sum behind it. A member with 8 hours of capacity and a four-hour assignment is at 50%.
Step 2 of 11
Spot a capacity change
A dashed line down a member's row marks the day their record changes. Point at it to see what changed, here their Capacity, from that day on.
Step 3 of 11
See utilization follow capacity
Planner measures each day against the capacity in force that day. After the change, the same assignment fills more of a shorter day, so the percentage goes up.
When a week looks busy, check the capacity behind it as well as the hours.
Step 4 of 11
Open Preferences
Press Preferences at the top of Planner. Its menu sets how utilization is counted and what the board shows. Nothing changes until you press Apply.
Step 5 of 11
Switch to billable capacity
Under Utilization based on, choose Total capacity or Billable capacity, then press Apply.
With billable capacity, each day is measured against its billable part, and non-billable assignments stop counting. A one-hour billable assignment is 25% of a four-hour day, and 50% when two of those hours are billable.
Step 6 of 11
Choose which statuses count
Under Include statuses for utilization, tick the statuses that count. Confirmed, Unconfirmed and Draft are all ticked at first.
Clear Draft and press Apply. Draft assignments stay on the board, but they no longer add to utilization.
Step 7 of 11
Group the board by project
The Member, Department and Project tabs above the board group it. Project gives each project its own row, with the members booked on it listed underneath, so you see who works on it and when.
Step 8 of 11
See work on other projects
Under a project, a member's assignments on other projects are faded. They are outside the group, but they stay on the board so you still see the member's whole workload.
Step 9 of 11
Hide filtered-out assignments
Open Preferences, clear Show filtered out assignments and press Apply. Assignments outside the current group or filters leave the board.
Utilization stays the same, because hiding changes what the board shows, not what it counts.
Step 10 of 11
Read a project's utilization
A project's own row adds up the hours booked on it each day and compares them with the capacity of the members working on it that day. Point at a day to see the hours behind the percentage.
Step 11 of 11
Leave placeholders out
A Placeholder is a planning-only entry for a future or temporary team member. Its row shows when the Member status filter includes placeholders, and its hours count in the project's row either way.
To see the load on real members only, tick Ignore Placeholders in group utilization in Preferences and press Apply. The placeholder keeps its own row.